"How soon can we open?" is the first question every client asks — here's an honest answer.
It's one of the most common questions we get, and understandably so — your fit-out timeline affects your lease start date, your rent obligations, your staffing plans, and quite often your sanity. The frustrating truth is that there's no single number that applies to every project. But there is a realistic way to think about timing, and understanding the stages involved makes a huge difference to how well you can plan around it. Here's what genuinely affects how long your fit-out will take.
The Short Answer: It Depends on Scope
As a general guide, most commercial fit-outs in Australia take somewhere between 6 and 12 weeks from the start of construction, though this varies significantly based on the size of the project, the complexity of the work, and how quickly approvals and materials come through. Smaller retail or hospitality fit-outs can sometimes move faster, while larger or more complex projects — particularly those involving significant structural work, custom joinery, or specialist compliance requirements — can take several months. And that's construction time alone; it doesn't include the planning and design phase that needs to happen before anyone picks up a tool.
Stage One: Planning and Design (Often Underestimated)
This is the phase most people forget to budget time for, and it's usually the one that determines whether the rest of the project runs smoothly. Working through your brief, finalising a layout, getting drawings and specifications locked in, and securing landlord and any required council approvals can realistically take a few weeks for a small to mid-sized tenancy — longer for anything more complex. Skipping or rushing this stage doesn't actually save time; it just moves the delay into construction, where it costs far more to fix.
Stage Two: Approvals — The Part You Can't Rush
Landlord approval, building permits, and compliance sign-offs are frequently the single biggest cause of delay in a fit-out timeline, and they're largely outside your shopfitter's direct control once submitted. Approval timeframes vary by council and by the complexity of your works, which is exactly why it's worth finding out early in the process how long approvals typically take in your specific area, and building that into your overall schedule rather than assuming it'll happen quickly.
Stage Three: Construction — Where Sequencing Matters
Once construction starts, a well-run fit-out follows a logical sequence: strip-out and demolition where needed, rough-in services like electrical, data and air conditioning, then framing, partitions, and finally finishes, fixtures and final fit-off. When trades are forced to work out of sequence — often because design wasn't fully locked in before construction started — it tends to create rework, compromised finishes, and extended time on site. This is one of the clearest reasons a single, coordinated team tends to move faster than juggling separate trades independently.
Stage Four: Fixtures, Furniture and Equipment Lead Times
This is another commonly underestimated factor. Custom joinery, specific furniture, signage and specialist equipment can all have lead times ranging from days to several weeks, depending on availability and specification. If these aren't ordered early enough in the process, they can hold up your opening date even after construction itself is finished — which is why experienced fit-out teams typically start procurement well before the final stages of the build.
What Actually Affects Your Specific Timeline
A few factors consistently move the needle more than others:
The starting condition of your space — a shell tenancy naturally takes longer than a previously fitted space.
The complexity of your compliance requirements — hospitality and healthcare fit-outs generally involve more approval steps than a straightforward office or retail tenancy.
How locked in your design is before construction starts — changes made mid-build are one of the most common causes of blown timelines.
Material and fixture availability — anything custom-made or imported needs to be ordered with its lead time factored in from the start.
Landlord and building access conditions — particularly in shopping centres or multi-tenant buildings, after-hours access rules and lift bookings can genuinely affect how quickly work can progress.
How to Get a Realistic Timeline for Your Project
The only way to get a genuinely accurate timeline is to work backward from your desired opening date with an experienced shopfitter who can map out design, approvals, procurement and construction against your specific scope — and build in a sensible buffer for the inevitable curveball. A vague verbal estimate isn't much use here; ask for a proper program with milestones, so you know exactly what's happening and when.
Helping Melbourne and Regional Victoria Businesses Plan Realistic Timelines
We work with businesses across Melbourne and the surrounding suburbs, as well as regional Victoria including Bendigo, Ballarat, Geelong, Melton, Somerville, Moe, Officer and Seymour, to build fit-out timelines that are realistic from the outset — so your opening date isn't a guess.
Frequently Asked Questions
1. What's a realistic timeframe for a commercial fit-out in Melbourne?
Most projects take somewhere between 6 and 12 weeks of construction, though this can be shorter for small, simple fit-outs or longer for larger and more complex projects. Design and approvals typically add further time before construction even begins.
2. What causes the most delays in a commercial fit-out?
Landlord and council approvals are one of the most common causes of delay, along with design changes made after construction has started and long lead times on custom fixtures or furniture.
3. Can I speed up my fit-out timeline?
The best way to keep a project on schedule is thorough planning before construction starts — locking in your design early, confirming approvals in advance, and ordering fixtures and equipment with enough lead time.
4. Does the condition of my tenancy affect how long the fit-out takes?
Yes, significantly. A shell or bare tenancy generally takes longer to fit out than a space that's already partially fitted, since more of the work is being built from scratch.
5. Should I sign my lease before or after confirming my fit-out timeline?
Ideally, review your likely fit-out timeline with a shopfitter before signing, so your lease start date and any rent-free fit-out period genuinely align with how long the project will realistically take.
Planning Your Opening Date?
Talk to MEA Shopfitting for a realistic timeline before you commit to a lease.